Home/Volume-3/Rope Haulages & Tracks Volume-3 Rope Haulages & Tracks Admin03/08/20240 12 Less than a minute Report a question What's wrong with this question? You cannot submit an empty report. Please add some details. 0% Rope Haulages & Tracks Rope Haulages & Tracks 1 / 46 1. The simplest system of haulage system for raising the loads? Main tail rope haulage Direct rope haulage Endless rope haulage Gravity 2 / 46 2. The gradient suitable for direct rope haulage is steeper than? 1 in 10 1 in 15 1 in 30 1 in 3 3 / 46 3. The general speed in rope haulage is? 3 to 7 km/h 2 to 3 Km/h 8 to 12 km/h 15 km/h 4 / 46 4. The limiting gradient for endless rope haulage is? 1 in 15 1 in 10 1 in 6 1 in 4 5 / 46 5. The rope speed in the endless rope haulage is? 8 to 12 km/h 2 to 3 Km/h 15 km/h 3 to 7 km/h 6 / 46 6. Where continuous movement of loaded and empty tubs are necessary the rope haulage suitable is? Direct rope haulage Endless rope haulage Gravity Main tail rope haulage 7 / 46 7. The surface of the drive pulley in endless haulage is? Flat Curved Tapered Grooved 8 / 46 8. In endless rope haulage the C.I sheets having the tapering of? 1 in 4 1 in 10 1 in 8 1 in 6 9 / 46 9. The correct place for tension bogey is? At the point where slack rope is most likely to occur Near the haulage engine Any point on the level roadway None 10 / 46 10. Smalman clip is the device used to attach? Gravity Main tail rope haulage Direct rope haulage Endless rope haulage 11 / 46 11. In over rope endless haulage system ...... is used for attaching the tubs? Cam clip Smallman clip Screw clip Lashing chain 12 / 46 12. The system of rope haulage most suitable for undulating roadways and where it is not possible or desirable to maintain two tracks is? Main and tail Gravity Endless rope Direct rope 13 / 46 13. In main and tail rope haulage the length of the tail rope is.....of the haulage plane? Equal 2 times 1/2 times 4 times 14 / 46 14. The system of rope haulage suitable with least cost to lower the loads to feed to the haulage at lowest level is? Endless rope haulage Main tail rope haulage Gravity Direct rope haulage 15 / 46 15. The factor of safety for the rope haulage is? 6 to 7 10 9 5 to 6 16 / 46 16. The weight of the tracks for locomotives of more than 10 te capacity? 18 kgf/m 10 kgf/m 28 kgf/m 16 kgf/m 17 / 46 17. The distance between two adjacent sleepers should not exceed? 0.6 m 1 m 0.5 m 0.85 m 18 / 46 18. For tubs of 1.1 cu.m capacity the rail section should be of minimum weight of? 10 kgf/m 16 kgf/m 28 kgf/m 18 kgf/m 19 / 46 19. The general track gauge for 1.1 cu.m tub? 0.9 m 1 m 0.3 m 0.6 m 20 / 46 20. The load on the tub axle; haulage speed; wet or dry condition of the mine will decide the selection of? Width of the track Type of haulage Weight and section of the rail Type of ballasting 21 / 46 21. The track gauge for locomotive is? 1.2 to 1.3 m 0.7 to 0.9 m 0.9 to 1 m 1 to 1.2 m 22 / 46 22. The purpose of the sleeper and ballast in the track is? To strengthen the tracks None Distribute the intense bearing pressure of wheels on the rails over a sufficient area of floor To prevent the tubs to fell down 23 / 46 23. The size of the ballast used in rail track is? 30 to 40 mm 50 to 60 mm 40 to 50 mm 60 to 80 mm 24 / 46 24. For the speed up to 13 kmph the radius of any curve in a main haulage road should be? Not less than 30 m Not less than 20 times longest rigid wheel base of any vehicle in the train Not less than 50 m Not more than 20 times longest rigid wheel base of any vehicle in the train 25 / 46 25. For bending the rail to suitable curvature the device used is? Jim crow Jokey Creeper Retaining key 26 / 46 26. The safety device consists of steel rail or wooden block pivoted at the end which is used for arresting backward runaway for tubs is? Drop warwick Back catch Stop block Back stay 27 / 46 27. The safety device consists of a wooden beam or block lying across the rails to prevent backward running of tubs is? Back catch Drop warwick Stop block Back stay 28 / 46 28. The safety device used behind an ascending set of tubs on direct or endless haulage to arrest runaway of tubs is? Back stay Back catch Drop warwick Runaway switch 29 / 46 29. The safety device used for arresting the forward runaway of tubs is? Back catch Back stay Drop warwick Runaway switch 30 / 46 30. The safety device is used effectively in case of direct rope haulage in the event of runaway of a set of tubs? Stop block with runaway switch Stop block Back stay Drop warwick 31 / 46 31. If the track gauge is more than 0.6 m then......... are preferred? Square pillars Circular Rhombus pillars Rectangle pillars 32 / 46 32. The haulage used up to 35 hp is called? Tugger haulage Endless haulage Rope haulage Gravity haulage 33 / 46 33. The limiting gradient for the tugger haulage is? 1 in 4 1 in 15 1 in 6 1 in 10 34 / 46 34. The size of direct rope haulage used underground generally ? Less than 150 HP Less than 250 HP More than 250 HP Less than 200 HP 35 / 46 35. The direct rope haulage with 150 HP the reasonable output is ? 800 te/day 600 te/day 400 te/day 1000 te/day 36 / 46 36. The maximum length of the rope haulage is? 1000 m 800 m 600 m 450 m 37 / 46 37. High capacity endless rope haulage may give ...? 600 te/day 800 te/day 400 te/day 1000 te/day 38 / 46 38. The maximum length of the endless rope haulage is? 450 m 1000 m 800 m 600 m 39 / 46 39. Limiting gradient for the main and tail rope haulage is? 1 in 6 1 in 8 1 in 10 1 in 3 40 / 46 40. To slow down the tubs the device used is? Runaway switch Back stay Hydraulic tub retarder Sprags 41 / 46 41. Steel ropes can be used for winding up to a maximum depth of? 300 m 100 m 400 m 200 m 42 / 46 42. In locomotive haulage system at the point of change in gradient the haulage track should be well graded over a length of? 24 m 30 m 20 m 12 m 43 / 46 43. The driving pulley used in endless rope haulage is? Clifton pulley Jig pulley Snub pulley None 44 / 46 44. The margin allowed...m allows a cage to be lifted for materials to be slung beneath it? 2 to 3 m 3 to 7 m 1 to 2 m 7 to 10 m 45 / 46 45. The component in the winding engine house that stores the energy by speeding up during periods of light load and delivers it by slowing during the heavy load period is? Electrical braker Flywheel Additional winding in the system Electrical gear 46 / 46 46. In long length of haulage system the effective signalling system is by the use of? 110 v line current Step down potential transformer High capacity battery Relays Your score is The average score is 50% LinkedIn Facebook Twitter 0% Admin03/08/20240 12 Less than a minute