Home/Volume-3/Rope Haulages & Tracks Volume-3 Rope Haulages & Tracks Admin03/08/20240 12 Less than a minute Report a question What's wrong with this question? You cannot submit an empty report. Please add some details. 0% Rope Haulages & Tracks Rope Haulages & Tracks 1 / 46 1. The simplest system of haulage system for raising the loads? Gravity Main tail rope haulage Direct rope haulage Endless rope haulage 2 / 46 2. The gradient suitable for direct rope haulage is steeper than? 1 in 3 1 in 30 1 in 15 1 in 10 3 / 46 3. The general speed in rope haulage is? 3 to 7 km/h 2 to 3 Km/h 8 to 12 km/h 15 km/h 4 / 46 4. The limiting gradient for endless rope haulage is? 1 in 6 1 in 15 1 in 4 1 in 10 5 / 46 5. The rope speed in the endless rope haulage is? 3 to 7 km/h 8 to 12 km/h 15 km/h 2 to 3 Km/h 6 / 46 6. Where continuous movement of loaded and empty tubs are necessary the rope haulage suitable is? Gravity Endless rope haulage Main tail rope haulage Direct rope haulage 7 / 46 7. The surface of the drive pulley in endless haulage is? Grooved Tapered Curved Flat 8 / 46 8. In endless rope haulage the C.I sheets having the tapering of? 1 in 10 1 in 8 1 in 4 1 in 6 9 / 46 9. The correct place for tension bogey is? None Any point on the level roadway Near the haulage engine At the point where slack rope is most likely to occur 10 / 46 10. Smalman clip is the device used to attach? Direct rope haulage Main tail rope haulage Gravity Endless rope haulage 11 / 46 11. In over rope endless haulage system ...... is used for attaching the tubs? Cam clip Lashing chain Screw clip Smallman clip 12 / 46 12. The system of rope haulage most suitable for undulating roadways and where it is not possible or desirable to maintain two tracks is? Endless rope Main and tail Direct rope Gravity 13 / 46 13. In main and tail rope haulage the length of the tail rope is.....of the haulage plane? Equal 2 times 1/2 times 4 times 14 / 46 14. The system of rope haulage suitable with least cost to lower the loads to feed to the haulage at lowest level is? Gravity Main tail rope haulage Direct rope haulage Endless rope haulage 15 / 46 15. The factor of safety for the rope haulage is? 10 9 5 to 6 6 to 7 16 / 46 16. The weight of the tracks for locomotives of more than 10 te capacity? 28 kgf/m 16 kgf/m 10 kgf/m 18 kgf/m 17 / 46 17. The distance between two adjacent sleepers should not exceed? 0.85 m 1 m 0.5 m 0.6 m 18 / 46 18. For tubs of 1.1 cu.m capacity the rail section should be of minimum weight of? 18 kgf/m 10 kgf/m 16 kgf/m 28 kgf/m 19 / 46 19. The general track gauge for 1.1 cu.m tub? 1 m 0.6 m 0.3 m 0.9 m 20 / 46 20. The load on the tub axle; haulage speed; wet or dry condition of the mine will decide the selection of? Type of haulage Type of ballasting Weight and section of the rail Width of the track 21 / 46 21. The track gauge for locomotive is? 1 to 1.2 m 0.7 to 0.9 m 1.2 to 1.3 m 0.9 to 1 m 22 / 46 22. The purpose of the sleeper and ballast in the track is? None Distribute the intense bearing pressure of wheels on the rails over a sufficient area of floor To strengthen the tracks To prevent the tubs to fell down 23 / 46 23. The size of the ballast used in rail track is? 50 to 60 mm 60 to 80 mm 40 to 50 mm 30 to 40 mm 24 / 46 24. For the speed up to 13 kmph the radius of any curve in a main haulage road should be? Not less than 50 m Not less than 20 times longest rigid wheel base of any vehicle in the train Not less than 30 m Not more than 20 times longest rigid wheel base of any vehicle in the train 25 / 46 25. For bending the rail to suitable curvature the device used is? Jokey Creeper Retaining key Jim crow 26 / 46 26. The safety device consists of steel rail or wooden block pivoted at the end which is used for arresting backward runaway for tubs is? Back stay Back catch Drop warwick Stop block 27 / 46 27. The safety device consists of a wooden beam or block lying across the rails to prevent backward running of tubs is? Back stay Stop block Drop warwick Back catch 28 / 46 28. The safety device used behind an ascending set of tubs on direct or endless haulage to arrest runaway of tubs is? Runaway switch Drop warwick Back catch Back stay 29 / 46 29. The safety device used for arresting the forward runaway of tubs is? Drop warwick Back stay Runaway switch Back catch 30 / 46 30. The safety device is used effectively in case of direct rope haulage in the event of runaway of a set of tubs? Stop block with runaway switch Back stay Drop warwick Stop block 31 / 46 31. If the track gauge is more than 0.6 m then......... are preferred? Rhombus pillars Rectangle pillars Circular Square pillars 32 / 46 32. The haulage used up to 35 hp is called? Tugger haulage Endless haulage Gravity haulage Rope haulage 33 / 46 33. The limiting gradient for the tugger haulage is? 1 in 4 1 in 15 1 in 10 1 in 6 34 / 46 34. The size of direct rope haulage used underground generally ? Less than 150 HP Less than 250 HP More than 250 HP Less than 200 HP 35 / 46 35. The direct rope haulage with 150 HP the reasonable output is ? 1000 te/day 600 te/day 800 te/day 400 te/day 36 / 46 36. The maximum length of the rope haulage is? 1000 m 450 m 600 m 800 m 37 / 46 37. High capacity endless rope haulage may give ...? 600 te/day 800 te/day 400 te/day 1000 te/day 38 / 46 38. The maximum length of the endless rope haulage is? 800 m 1000 m 600 m 450 m 39 / 46 39. Limiting gradient for the main and tail rope haulage is? 1 in 10 1 in 8 1 in 6 1 in 3 40 / 46 40. To slow down the tubs the device used is? Hydraulic tub retarder Back stay Runaway switch Sprags 41 / 46 41. Steel ropes can be used for winding up to a maximum depth of? 100 m 300 m 400 m 200 m 42 / 46 42. In locomotive haulage system at the point of change in gradient the haulage track should be well graded over a length of? 12 m 24 m 30 m 20 m 43 / 46 43. The driving pulley used in endless rope haulage is? Clifton pulley Jig pulley None Snub pulley 44 / 46 44. The margin allowed...m allows a cage to be lifted for materials to be slung beneath it? 7 to 10 m 1 to 2 m 2 to 3 m 3 to 7 m 45 / 46 45. The component in the winding engine house that stores the energy by speeding up during periods of light load and delivers it by slowing during the heavy load period is? Flywheel Electrical gear Electrical braker Additional winding in the system 46 / 46 46. In long length of haulage system the effective signalling system is by the use of? High capacity battery Relays Step down potential transformer 110 v line current Your score is The average score is 50% LinkedIn Facebook Twitter 0% Admin03/08/20240 12 Less than a minute