Home/Coal Mining Legislation/Coal Mining Legislation – 12 Coal Mining Legislation Coal Mining Legislation – 12 Admin07/08/20240 10 Less than a minute Report a question What's wrong with this question? You cannot submit an empty report. Please add some details. 0% Coal Mining Legislation Coal Mining Legislation - 12 1 / 40 1. The stations for the persons to stay before shift starting shall be located at As near to the work place as possible so as to reduce strain on the persons while walking, At the entrance to the district or working At the entrance of the panel At the entrance of the mine Coal Mining Legislation 2 / 40 2. Shafts or galleries driven to lead directly into a working places or travelling roadways can be source of danger from falling objects from top to bottom. The area around the dip side of such gallery has to be fenced if the inclination to horizontal exceeds. 55 degrees 35 degrees 45 degrees 30 degrees Coal Mining Legislation 3 / 40 3. If there are two seams one above another workings shall not be made in both of them at the same time if the distance between them is ___ meters ten meters less seven meters less six meters or less nine meters or less Coal Mining Legislation 4 / 40 4. When the width of gallery is 4.2 meters, and at a depth is 60-90 meters, the pillar to pillar distance shall not be less than 19.5 meters 15.0 meters 18.0 meters 13.5 meters Coal Mining Legislation 5 / 40 5. When it is proposed to operate the coal seam in a method other than Board and Pillar, information is to be submitted to the Regional Inspector in Form V of Third schedule, Form II of Third schedule, Form III of the Third Schedule Form IV of First schedule Coal Mining Legislation 6 / 40 6. When the width of gallery is 4.8 meters, and at a depth is 150-240 meters, the pillar to pillar distance shall not be less than 22.5 meters 25.5 meters 34.5 meters 30.5 meters Coal Mining Legislation 7 / 40 7. The anchoring of the return station of the conveyor should be tied to Firmly to a roadway with steel anchor, Can be tied to a steel made face support, Shall be tied to a separate support None of the above Coal Mining Legislation 8 / 40 8. Persons shall not carry load along a road or footpath having an inclination to horizontal more than. 45 degrees 55 degrees 30 degrees 35 degrees Coal Mining Legislation 9 / 40 9. Fencing has to be formed around an excavation when the distance of any mining operations extends within a distance of-------meters from a public road or any building. 25 meters 10 meters 30 meters 15 meters Coal Mining Legislation 10 / 40 10. When the width of gallery is 4.2 meters, and at a depth is > 360 meters, the pillar to pillar distance shall not be less than 22.5 meters 45.0 meters 28.5 meters 42.0 meters Coal Mining Legislation 11 / 40 11. When the workings are simultaneously done one above another, the minimum parting left between two seams or section shall not be less than ____meters in any place six five four three Coal Mining Legislation 12 / 40 12. When the width of gallery is 4.8 meters, and at a depth is 60 to 90 meters, the pillar to pillar distance shall not be less than 19.5 meters 15.0 meters 18.0 meters 21.0 meters Coal Mining Legislation 13 / 40 13. When the width of gallery is 4.2 meters, and at a depth is 150-240 meters, the pillar to pillar distance shall not be less than 22.5 meters 25.5 meters 18.0 meters 30.5 meters Coal Mining Legislation 14 / 40 14. The Sirdar of the district shall inspect the workings (If required along with his assistants if any) __ hours before the starting of the work One hour Four hours Two hours Just starting of the shift Coal Mining Legislation 15 / 40 15. When the width of gallery is 4.8 meters, and at a depth is 240-360 meters, the pillar to pillar distance shall not be less than 22.5 meters 39.5 meters 28.5 meters 45.0 meters Coal Mining Legislation 16 / 40 16. The space between the conveyor and one side of the roadway shall not be less than -----wide. Two meters One meters Four meters Six meters Coal Mining Legislation 17 / 40 17. When the width of gallery is 4.2 meters, and at a depth is 240-360 meters, the pillar to pillar distance shall not be less than 22.5 meters 39.5 meters 28.5 meters 16.5 meters Coal Mining Legislation 18 / 40 18. On every conveyor exceeding --------- there shall be signaling arrangement. 60meters 45meters 50meters 30meters Coal Mining Legislation 19 / 40 19. While carrying load along a footpath by human agency, its breadth of such footpath shall not be less than three meter four meter two meter one meter Coal Mining Legislation 20 / 40 20. The contraventions pointed out during inspection shall be displayed ___ days of the entry in to the form. Four days Three days 24 hours One week Coal Mining Legislation 21 / 40 21. When the width of gallery is 4.8 meters, and at a depth is < 60 meters, the pillar to pillar distance shall not be less than 12.0 meters 15.0 meters 18.0 meters 19.5 meters Coal Mining Legislation 22 / 40 22. Every haulage engine, brake-wheel, rope and other appliance shall be examined once in every----------- 12 hours 6 hours 14 hours 24 hours Coal Mining Legislation 23 / 40 23. The remedial measures taken to remove contravention of observations by Regional inspector of Chief inspector shall be intimated by the owner, agent or manager of the mine within a period not exceeding ____ from the date of the entry. fifteen days twelve days ten days eleven days Coal Mining Legislation 24 / 40 24. The number of inspections to be done by the Sirdar during working in respect of all road ways where persons are likely to travel is One only at the beginning As frequently as possible depending on size of district Once in two hours Once at the beginning and one after Four hours Coal Mining Legislation 25 / 40 25. When there is danger of any subsidence taking place due to underground excavations a fencing is to be erected under the following condition. Fencing to be erected around the area after the subsidence takes place, Fencing to be erected around the area that is likely to subside even before subsidence takes place, Fencing to be erected around the mining lease boundary, None of the above Coal Mining Legislation 26 / 40 26. When there are two or more seams working one above the other the pillars in both of them shall be as far as possible one above other. This is to be followed unless the strata are inclined at an angle of more than ------to the horizontal. 45 degrees 30 degrees 25 degrees 35 degrees Coal Mining Legislation 27 / 40 27. The tracks in the gravity haulage system and its safety fittings are to be inspected once at least in every ---days. Six Seven Nine Eight Coal Mining Legislation 28 / 40 28. Strong guard rails, fence or rope is to be provided along the foot path to prevent persons to fall, when the likely fall is more than ___ meters. 1.0 meters 1.5 meters 1.8 meters 1.08 meters Coal Mining Legislation 29 / 40 29. When the workings are approaching railway line, extraction or reduction of pillars shall not be conducted within ___ distance. 25 meters 35 meters 55 meters 45 meters Coal Mining Legislation 30 / 40 30. The distance between centers of adjacent pillars shall not be less than---where the width of the galleries is 3.6 meters and depth 240 to 360.0 meters. 22.5 meters 34.5 meters 28.5 meters 16.5 meters Coal Mining Legislation 31 / 40 31. The footpath shall not be less than ___ meters in its width. 1.5 meters, 1.8 meters, 1.0 meters, 2.5 meters, Coal Mining Legislation 32 / 40 32. When the width of gallery is 4.8 meters, and depth is > 360 meters, the pillar to pillar distance shall not be less than 22.5 meters 45.0 meters 48.0 meters 42.0 meters Coal Mining Legislation 33 / 40 33. The contraventions pointed out by the Regional inspector are recorded in Form I Form V Form II Form VI Coal Mining Legislation 34 / 40 34. The register of contraventions shall be kept available for inspection in the office of the mine for a period of at least --------years after the date of making of the last entry in it. three four six three Coal Mining Legislation 35 / 40 35. The distance between centers of adjacent pillars shall not be less than-------where the width of the galleries does not exceed 3.6 meters and depth more than 360.0 meters. 22.5 meters 39.0 meters 28.5 meters 42.0 meters Coal Mining Legislation 36 / 40 36. When the width of gallery is 4.8 meters, and at a depth is 90-150 meters, the pillar to pillar distance shall not be less than 22.5 meters 25.5 meters 19.5 meters 16.5 meters Coal Mining Legislation 37 / 40 37. While stowing is practiced the details of sand used and coal extracted shall be furnished to Regional Inspector during—day of every month. 10th day 11th day 12th day 9th day Coal Mining Legislation 38 / 40 38. The contraventions pointed out during inspection of Regional inspector are to be placed on the notice board for a minimum period of Fifteen days. Twelve days. Ten days. Seven days. Coal Mining Legislation 39 / 40 39. When the width of gallery is 4.2 meters, and at a depth is 90-150 meters, the pillar to pillar distance shall not be less than 19.5 meters 16.5 meters 22.5 meters 15.0 meters Coal Mining Legislation 40 / 40 40. When the width of gallery is 4.2 meters, and at a depth of less than 60 meters, the pillar to pillar distance shall not be less than 12.0 meters 15.0 meters 18.0 meters 19.5 meters Coal Mining Legislation Your score is The average score is 0% LinkedIn Facebook Twitter 0% Admin07/08/20240 10 Less than a minute