Home/Coal Mining Legislation/Coal Mining Legislation – 6 Coal Mining Legislation Coal Mining Legislation – 6 Admin07/08/20240 4 Less than a minute Report a question What's wrong with this question? You cannot submit an empty report. Please add some details. 0% Coal Mining Legislation Coal Mining Legislation - 6 1 / 40 1. When the cage is at the bottom of the shaft, the maximum permissible gap (both vertical and horizontal) between the protective roofing and the top of the cage is ___ 15 cm 30 cm 10 cm 40 cm Coal Mining Legislation 2 / 40 2. If the depth of the shaft is 1000 meters, then the maximum permissible speed of cage during man winding is ____ m/sec? 10 8 7 5.5 Coal Mining Legislation 3 / 40 3. When any investigation of an area, or local knowledge indicates the existence of unconsolidated surface deposit with the boundary of mine or within _ the same shall be depicted on the geological plan 60 m 90 m 120 m 150 m Coal Mining Legislation 4 / 40 4. If the monthly output of the mine is 35000 tons, the number of surveyors required as per statute is? 2 3 4 5 Coal Mining Legislation 5 / 40 5. If any ladder is fixed in a shaft, it shall not have an inclination of not more than ___ from the horizontal? 600 700 800 450 Coal Mining Legislation 6 / 40 6. The plans shall show all features both above and below ground of all adjacent mines as are situated within ___ of horizontal plane 30 m 60 m 75 m 100 m Coal Mining Legislation 7 / 40 7. Every shaft in the course being sunk shall be provided with a permanent lining of steel rings which shall at no time be more than ___ from the bottom of shaft? 20 m 5 m 6 m 10 m Coal Mining Legislation 8 / 40 8. Where the shaft is more than ___ in depth the arrangements for persons to descend and ascend is to be done by mechanical means? 30 m 60 m 75 m 100 m Coal Mining Legislation 9 / 40 9. Generally in coal seams having inclination of more than ____ the pillars develop internal torque, due to vertical and horizontal forces? 1 in 3 1 in 4 1 in 6 1 in 8 Coal Mining Legislation 10 / 40 10. The floor area available per person in a shaft shall be at least ___ Sq. meters 0.2 0.4 O.6 O.5 Coal Mining Legislation 11 / 40 11. Combined plans shall be maintained in respect of all seams separately which are lying within ____ of each other and working in different seams and all sections shall be shown in different colors? 3 m 6 m 9 m 12 m Coal Mining Legislation 12 / 40 12. During every year a manager shall submit Chief Inspector, up to date copies of the plans on or before ___ (CHANGED) 14th March 1ST Febuary 31st October 2nd July Coal Mining Legislation 13 / 40 13. The plans shall be drawn with a contour interval not exceeding _____ 5 m 3 m 8 m 10 m Coal Mining Legislation 14 / 40 14. Where it is not possible to show the complete boundary of leasehold on the same plan; an additional KEY PLAN having scale ___ shall be shown? 100.0006944 208.3340278 25000 : 1 50000 : 1 Coal Mining Legislation 15 / 40 15. In code of signaling for raising the cage is by giving 1 rap 2 raps 3 raps 4 raps Coal Mining Legislation 16 / 40 16. Shafts and outlets shall not be less than _____ distance from each another at any point 12.5 m 13.5 m 14.5 m 16 m Coal Mining Legislation 17 / 40 17. A detaching hook shall be provided for each bucket if the shaft exceeds ____ in depth 30 m 45 m 60 m 100 m Coal Mining Legislation 18 / 40 18. When the cage is at its lowest position, the minimum number of turns that the winding drum should contain is____ 2 3 4 5 Coal Mining Legislation 19 / 40 19. When a working approaches within ___ meters of any water body, a warning line shall be shown in the plan 60 m 90 m 120 m 150 m Coal Mining Legislation 20 / 40 20. If the depth of the shaft in 500 meters, then the maximum permissible of the cage during man winding is ____ m/sec? 10 8 7 5.5 Coal Mining Legislation 21 / 40 21. Every shaft or incline shall be examined once in at least _____ 7 days 14 days 1 month 3 months Coal Mining Legislation 22 / 40 22. The stress created by an opening extend up to a distance which is about ___ times the height of the opening? 1.3 1.5 1.75 2.1 Coal Mining Legislation 23 / 40 23. The descending cage when landing at the pit bottom shall not exceed a speed of landing of ___ m sec? 1 1.5 2 3 Coal Mining Legislation 24 / 40 24. The RF of the dust plan is? 83.33402778 50.00069444 100.0006944 62.50069444 Coal Mining Legislation 25 / 40 25. The convergence of roof per meter span should not exceed ___ mm in case of coal or shale roof? 2.53125 45 : 60 1.28125 1.895833333 Coal Mining Legislation 26 / 40 26. The maximum speed of the rope in man winding in case of deep shafts shall not exceed 12m/s 15 m/s` 10 m/s 20 m/s Coal Mining Legislation 27 / 40 27. If the depth of the shaft is 400 m then the maximum speed of the cage in shaft sinking is _____ m/sec? 1.5 2.5 3.3 5.2 Coal Mining Legislation 28 / 40 28. The spot levels recorded and depicted on the plans shall not be more than ____ apart 100 m 150 m 200 m 300 m Coal Mining Legislation 29 / 40 29. If the depth of a second outlet is more than __ suitable cage shall be provided for ascending and descending of persons? 50 m 20 m 40 m 70 m Coal Mining Legislation 30 / 40 30. When any working approaches within ___ meters of any water body a statutory restriction line shall be depicted on the plan 60 m 90 m 120 m 150 m Coal Mining Legislation 31 / 40 31. Where direct engine is used, and when the cage is at its normal position at the top of the shaft, the maximum permissible space between detaching book and the detaching bell is ___ 3.6 m 5 m 3. 6 m None Coal Mining Legislation 32 / 40 32. The gap between the floor of the cage and the lowest part and fence shall not exceed ___ 15 cm 15 cm 30 cm 10 cm Coal Mining Legislation 33 / 40 33. The gap between any two members of the gate shall not exceed ___ 25 cm 15 cm 30 cm 10 cm Coal Mining Legislation 34 / 40 34. An independent means of signaling is to be provided when the winding depth is equal to or more than ____ 60 m 100 m 150 m 250 m Coal Mining Legislation 35 / 40 35. The RF of the water danger plan is? 100.0006944 62.50069444 83.33402778 50.00069444 Coal Mining Legislation 36 / 40 36. Automatic contravenes test and brake examination shall be conducted once in at least every __ 7 days 14 days 30 days 2 months Coal Mining Legislation 37 / 40 37. Where geared engine is used, and when the cage is at its normal position at the top of the shaft, the maximum permissible space between detaching book and the detaching bell is ___ 1.8 m 2.5 m 3 m None Coal Mining Legislation 38 / 40 38. Every shaft in the course of being sunk shall be provided with the permanent lining of the metal; concrete which shall at no time be placed at a height of more than ___ form the bottom of the shaft 20 m 5 m 6 m 10 m Coal Mining Legislation 39 / 40 39. In shafts of more than ____ depth, over wind switch shall be provided 60 m 100 m 150 m 250 m Coal Mining Legislation 40 / 40 40. When it is intended to bring into use any new man-winding installation, a notice is to be given to Regional Inspector not less than ___ before such installation is put to use 30 days 60 days 100 days 120 days Coal Mining Legislation Your score is The average score is 0% LinkedIn Facebook Twitter 0% Admin07/08/20240 4 Less than a minute