Coal Mining Legislation

Coal Mining Legislation – 1

Report a question

You cannot submit an empty report. Please add some details.
0%

Coal Mining Legislation

Coal Mining Legislation - 1

1 / 40

1. The protective footwear shall be supplied free of charge, at intervals not exceeding-------

2 / 40

2. The air pressure that a compressor gauge shows indicates

3 / 40

3. An official of a mine shall be literate and

4 / 40

4. When Calcium carbide is to be used underground the maximum weight that can be taken below ground for usage is not more than --------.

5 / 40

5. The manger shall fix, from time to time, the maximum number of shots that a shot-firer may fire in any one shift and shall not in any case exceed the number of shots that that a shotfirer can fire in a gassy seam of second or third degree or a fiery seam is

6 / 40

6. In the case of a misfire which of the following statements is not correct,

7 / 40

7. When two working places belowground have approached within___distance to each other all persons have to be withdrawn from both working places before blasting

8 / 40

8. In a non-gassy seam the number of shots with single shot exploder and multi shot exploder is respectively

9 / 40

9. If an appeal is to be made to Chief Inspector against an order made by the Regional Inspector, it should be submitted within ___ days along with the order received by the appellant.

10 / 40

10. Before an air compressor is put to use it should be subjected to a hydraulic test at a pressure of ___ times the working pressure

11 / 40

11. Except in a stone drift or a sinking shaft, not more than__ holes shall be fired in any one round if initiation is non-electrical and not more than____ if initiation is done electrically.

12 / 40

12. While using permitted explosives, the drill-hole depth in relation to undercut, overcut or side cut shall be ---

13 / 40

13. The cable used for blasting shall have a length of minimum

14 / 40

14. Drill hole diameter shall be such that there will be a clearance of ___ cm between the explosive cartridge and wall.

15 / 40

15. The number of shots that are fired in opencast mines is

16 / 40

16. The aggregate maximum charge in all the holes fired at one time shall not exceed------.

17 / 40

17. In a stone drift after shots have been fired, all loose rock within ___ meters from face shall be removed from the face, cleaned or washed with water and examined for the presence of misfires or sockets.

18 / 40

18. When the shots are fired in non-electrically, the time after which the blasting area can be entered is.

19 / 40

19. Every fence on the surface shall be inspected once in

20 / 40

20. If an appeal is to be made by any appellant to the committee it shall be done within __ days of the receipt of the order by the appellant

21 / 40

21. A copy of the manpower plan has to be available with

22 / 40

22. Every blasting apparatus shall be cleaned and overhauled by a competent person once in.

23 / 40

23. The manager shall submit a copy of emergency plan to the regional inspector, within ___ days of opening or re-opening of the mine.

24 / 40

24. If the explosive is Non-Permitted Explosive it can be used in

25 / 40

25. A manpower distribution plan has to be prepared in every mine during

26 / 40

26. If the shots are fired electrically, the time after which the persons can enter the blasting area is.

27 / 40

27. While blasting in gassy mines the following shall not be done

28 / 40

28. The periodicity of conducting hydraulic test is once in ___

29 / 40

29. Before charging shot-holes, and before firing test for inflammable gas has to be tested for in and around a radius of ___ meters of the place of firing.

30 / 40

30. No blasting shall be if the shortest distance from the place of firing to any part of such building or structure is less than --------irrespective of the amount of the charge.

31 / 40

31. The competent persons meant for inspection of all machinery and plant shall inspect once in ___

32 / 40

32. When any repair or modification is done on a compressor the following action is to be taken

33 / 40

33. When doing a blasting underground the area of blasting, all accessible places including roof and sides within a distance of -----------------should be stone dusted, unless such places are naturally wet.

34 / 40

34. If blasting is done with delay detonators with at least -----------Milli second delay the aggregate charge of 2kg per delay can be used.

35 / 40

35. A relieving hole shall be drilled from the misfire hole at a distance of at least ----- meters away throughout the depth of the relieving hole.

36 / 40

36. The danger zone is the area falling within a radius of -------------------------------from the place of firing (danger zone) and persons within this area shall take proper shelter.(Changed)

37 / 40

37. Where the wet bulb temperature exceeds ------- degrees centigrade arrangements are to be made to ventilate the same with a current of air moving at a speed of not less than one meter per second

38 / 40

38. Where the Chief Inspector or the said Inspector fails to inspect the place of accident within___ the area of accident can be disturbed after taking authenticated sketch of the area and photographs.

39 / 40

39. In case some 1st degree mine is classified as second or third degree gassy mine, the Central Government or the Chief Inspector or an Inspector can conditionally permit usage of non-flame proof apparatus that is already under use as per 1st degree gassy standards, for a period, not exceeding--------------

40 / 40

40. The minimum length of fuse that is to be used during blasting a Shot-hole is.

Your score is

The average score is 49%