1. The temperature and relative humidity of the mine air shall be checked and calculated once in ___?

2 / 40

2. If a member of committee leaves India for more than ___ he shall tender his resignation?

3 / 40

3. If due to some reason the boundary of a mine is changed, as per sub-regulation (1) of regulation 107, a plan showing the new boundary, shall be submitted within.

4 / 40

4. Minimum age for being a member of trade union is __ years (Changed)

5 / 40

5. A labour court shall consists of one person who must have held judicial office in India for not less than___

6 / 40

6. Conciliation officer shall send a report to govt. within __ days of starting of conciliation proceedings

7 / 40

7. General body of air means

8 / 40

8. Managing for minimizing external control and maximizing internal motivation is achieved by?

9 / 40

9. The number of members in a Board of Conciliation is __?

10 / 40

10. The termination of the services of a worker not by way of disciplinary action is called?

11 / 40

11. Work’s committee is formed in the mines employing more than ___ workers?

12 / 40

12. Gassy seam of the first degree means

13 / 40

13. Accident frequency rate is calculated in terms of ___ man shifts worked?

14 / 40

14. In case Chief Inspector, or Regional Inspector fail to inspect the place of accident within___ of occurrence accident, the work may be resumed

15 / 40

15. The team of the office of the elected member of the canteen is ___?

16 / 40

16. No person can be appointed as the presiding officer of the Tribunal unless he has been a judge of the High Court for not less than __ years?

17 / 40

17. Notice period that should be given to workmen before retrenched is ___

18 / 40

18. “Gas” includes ---------

19 / 40

19. No person shall be employed in any seam where the outlets or openings of the seam are within ___ of an active fire or spontaneous heating in a higher seam or fire on the surface?

20 / 40

20. Every mechanical ventilator (booster) in u/g mine shall be examined once in ___ ?

21 / 40

21. Gassy seam of the second degree means

22 / 40

22. All the equipment provided for the fire fighting are to be tested once in ___

23 / 40

23. Quantity of the air circulating in mine shall be calculated once in ___ in deg III gassy mine?

24 / 40

24. Accident frequency rate is calculated in terms of _____ persons employed?

25 / 40

25. The welfare officer shall be assisted with additional welfare officer for every additional ___ persons employed?

26 / 40

26. Annual Returns are to be submitted on or before

27 / 40

27. Every depillaring district shall be inspected ___?

28 / 40

28. Under Regulation (4) of CMR1957 Monthly Returns are to be submitted on or before

29 / 40

29. Examination of air crossing; ventilation stopping’s shall be done once in ___?

30 / 40

30. Gassy seam of the third degree means

31 / 40

31. A notice of construction of the water dam shall be sent within ___?

32 / 40

32. When it is intended to reopen an isolated part of a mine, the manager shall give a notice of ___not less than before commencement of reopening to Regional Inspector

33 / 40

33. When working near the waterlogged area the plans that are used shall be prepared up to date of ___?

34 / 40

34. “Fiery seam” means

35 / 40

35. No person shall be employed where the parting with an overlying seam on fire or in which spontaneous heating has taken place consists of less than ___ of hard rock parting in between?

36 / 40

36. The stone dust shall be tested once in ___ for its quality and caking properties

37 / 40

37. Checking of atmosphere behind stopping shall be done once in ___

38 / 40

38. The type of fire extinguisher used in explosive van is ___?

39 / 40

39. If any change in ownership and addresses, or change of name of the mine takes place a notice in form I is to be given

40 / 40

40. If the boundary of the mine changed a plan showing the new boundary shall be submitted within ___ to Regional Inspector

Your score is

The average score is 65%

0%

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button