Volume-1

Bord and Piller Method – 1

Report a question

You cannot submit an empty report. Please add some details.
0%

Bord and Piller Method of Working Coal

Bord and Piller Method - 1

1 / 28

1. In which line of extraction one solid stook intervenes between two stooks under extraction at a time?

2 / 28

2. The gradient in the cross cut should not be less than?

3 / 28

3. Coal seams are said to be contiguous if the two seams are separated by a parting of less than?

4 / 28

4. The fall which takes place soon after withdrawal of supports is called ?

5 / 28

5. The water-bearing quality of a seam is measured by the?

6 / 28

6. Coal mine operations are prohibited if the cover is less than?

7 / 28

7. The pillar is splitted into 2 or more stooks if the pillar size is more than?

8 / 28

8. In Indian mines the ratio of the quantity of water pumped from underground workings to the quantity of coal produced varies?

9 / 28

9. Once the pillar extraction is commenced the splitting is of pillars may be done upto.....pillars ahead of the pillar is under extraction?

10 / 28

10. The minimum thickness of the coal seam for adopting Bord and pillar method of mining?

11 / 28

11. The pillars formed during development are split into small pillars are called?

12 / 28

12. The average number of faces in a district if the number of headings is 'N'?

13 / 28

13. Working coal in the pillars formed in the operation in bord and pillar mining is?

14 / 28

14. Coal mine operations are prohibited if the common boundary is within?

15 / 28

15. If the depillaring is proceeding from dip to rise and seam inclination is not mild so that goaf can be submerged in water then the line of goaf is?

16 / 28

16. If the pillars are not strong they may be crushed due to sudden pressure is called?

17 / 28

17. The critical width of extraction at which the subsidence at the bottom of the trough has a maximum possible value is?

18 / 28

18. Upto what gradient the Bord and pillar mining can be adopted without special arrangements?

19 / 28

19. During depillaring if the roof is laminated local fall occurs ....hours after the props are withdrawn?

20 / 28

20. During extraction of coal the minimum thickness of the coal(rib) is left against the goaf is?

21 / 28

21. During development the height of the gallery should not exceed?

22 / 28

22. The galleries driven through the pillar for forming stooks are called?

23 / 28

23. The minimum distance between two sections should be if one is working at floor and one at the top?

24 / 28

24. A face or working place which is parallel to the main cleat is said to be?

25 / 28

25. Main fall occurs When the area of extraction is nearly equal or more than the .....of the depth?

26 / 28

26. With a good sandstone roof the area exposed may not more than .....sq.m at one stook extraction and ......sq.m if 3-4 stooks under extraction?

27 / 28

27. Drivage of two sets of roads and forming of pillar is known as?

28 / 28

28. In which line of extraction the pillar or stook is under excessive pressure and is liable to crush?

Your score is

The average score is 54%

0%

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button